Office Relocation Services in India by Agarwal (ALPM) Packers and Movers
Workstations, chairs, storage, files and IT equipment packed, moved and placed by desk at your new office, scheduled around your working hours. Your IT team or provider handles data, shutdown and reconnection. We handle the physical move.
Evening and weekend slots, subject to building rules and availability
An office move is judged by how quickly your team can work again, not just by whether the furniture arrived. That depends on two separate pieces of work. The first is the physical move: packing, dismantling, loading, transport, placing and reassembling furniture and equipment. The second is bringing the business back online: restoring data, reconnecting networks and phones, and testing systems.
Agarwal (ALPM) Packers and Movers handles the physical move. Your IT team or provider owns backups, shutdown, cable mapping, reconnection and testing. Planning both pieces of work together, with named owners and a clear handover point, is what keeps disruption short.
Many offices move after working hours or over a weekend, where both buildings allow it. Larger offices often move in phases, department by department. The right approach depends on your asset count, building rules, how ready the new site is, and which teams depend on each other.
One Point of Contact
A named contact for your admin, facility and IT teams throughout planning and the move.
Desk-Wise Planning
Every asset is labelled with its current and new location, so placement follows your layout.
Office cargo loading. Match carton and asset numbers to your destination plan, and keep confidential file contents off public labels.
Commercial and Corporate Shifting Services
From a small office with a few desks to a multi-floor move in phases, each part of the work is scoped separately in your quote.
IT Equipment Handling
Physical packing, transport and placement of servers, network equipment, storage units, monitors, CPUs and printers. Equipment is cushioned and packed upright where the maker's guidance requires, and every unit is labelled to its destination. Your IT team or provider shuts it down, de-racks it and maps the cables first, and reconnects and tests it afterwards.
Modular Workstation Dismantling and Reassembly
Linear workstations, cubicles, cabins, conference tables and storage are dismantled, labelled by seat or zone, and reassembled to your new layout plan, where the furniture's design allows. Some proprietary systems need the supplier's own fitter; tell us the make at the survey.
Confidential Files and Records
Files and records are packed in sealed, numbered cartons or crates. Labels show only a box number and destination; the index of what each box contains stays with your authorised staff. Count boxes at loading and unloading, and agree which authorised people may open them.
Desktop Kits by Seat
Each desk's monitor, CPU or dock, keyboard, phone and cables are packed and labelled as one set with the seat number, so they arrive at the right desk ready for your IT team to reconnect.
Heavy and Specialist Equipment
Safes, large copiers, test instruments and similar heavy items are assessed at the survey. Where an item needs specialist lifting, rigging or maker-led preparation, as UPS battery banks often do, we will say so and agree who arranges it before the move date.
Employee Household Moves
If your company is relocating staff, record the inventory, addresses and dates for each employee. Agree whether quotes and approvals are individual or centrally managed, and confirm the invoice addressee with your finance team.
Who Does What: The Physical Move and the IT Restart
Tasks can be missed when responsibility is unclear. Agree this split before the move date, with a named person for each line.
Task
Usually owned by
Done when
Asset list and new seating plan
Your admin or facility team, with our survey
Every desk and asset has a current and new location
Data backup and verified restore
Your IT team or provider
A test restore has worked before shutdown
Shutdown, de-racking and cable mapping
Your IT team or provider
Equipment is off, labelled and ready to pack
Packing, dismantling, loading and transport
ALPM
Count and condition are recorded at loading
Building permissions, lifts and loading bays at both sites
Your facility team, with our input on timing
Written permissions and slots are confirmed
Unloading, placement and furniture reassembly
ALPM
Your representative checks items against the asset list
Racking, cabling, reconnection and testing
Your IT team or provider
Systems pass your own tests
Open items list
Shared
Any missing, damaged or unassembled item has an owner and a date
Physical handover and business go-live are separate sign-offs. Your team signs for the physical delivery against the asset list. Your IT team decides when systems are ready for staff.
Is the New Office Ready? And Should You Move in Phases?
Check before you authorise loading
Power is live at the desks and in the server or network room.
Internet and phone lines are installed and tested by your provider.
Fit-out work is finished in the areas where furniture will go.
Lifts, loading bays and entry permissions are confirmed in writing for the move slot.
A named person will receive and sign at the new site.
If any of these is not ready, decide in advance whether to delay the move, move only the parts that can be placed, or hold some items until the site is ready. If holding is needed, agree in writing who holds them, where, at what cost, and how they are released.
One window or phases?
Moving everything in one window suits smaller offices where every team can stop work at the same time. A phased move suits larger offices, offices with teams that must keep working, or a new site that is only partly ready.
When planning phases, group teams that depend on each other, such as a department and the shared equipment it relies on, so no one arrives without what they need. Moving the server or network room usually has to be timed around your IT team's cutover plan, not just around furniture.
EXAMPLE TIMELINE
An Example Weekend Office Move
This is an illustration of how a single-floor office move could run over a weekend. It is not a fixed schedule or a promise. Your timing depends on the asset count, building rules at both sites, distance, and when your IT team completes its tasks.
Friday evening: shutdown and personal packing
Staff pack personal items into labelled cartons. Your IT team backs up and shuts down systems. Our crew packs desktop kits by seat.
Saturday morning: dismantling
Workstations, conference tables and storage are dismantled, with hardware bagged by seat. Equipment de-racked by your IT team is packed and labelled.
Saturday afternoon: loading and transport
Assets are loaded in the agreed order and counted, and the condition of furniture and equipment is recorded. They then travel to the new site.
Sunday morning: placement and reassembly
Furniture is placed and reassembled to the new layout, and desktop kits are set at their seats.
Sunday afternoon: IT reconnection
Your IT team racks, cables and tests equipment. Our crew remains available for physical adjustments, if agreed.
Sunday evening: handover
Packing material is cleared where included. Your representative checks items against the asset list, and any open items are recorded with an owner and a date.
IT EQUIPMENT
Moving Servers, Network and IT Equipment
We handle IT equipment physically: packing, carrying, transporting and placing it. Technical preparation and restart stay with your IT team or provider, who know your systems.
Cushioned Packing
Equipment is wrapped and cushioned, and packed upright where the maker's guidance requires. Original boxes are used where suitable and available. Ask your IT team or equipment vendor which components need ESD protection and which cases, cushioning or handling precautions should be included in the packing scope.
Labelled to Destination
Each unit carries a label with its asset number and destination room or rack, matched to your asset list.
Cables Kept With Their Equipment
Cables that your IT team has labelled and mapped are bagged with their equipment, so reconnection follows your own map.
Before IT equipment is packed
Your IT team takes and verifies a backup, with a test restore, before shutdown.
Your IT team shuts down systems, de-racks servers and maps cables.
UPS units, battery banks and similar equipment are prepared as their maker or service vendor directs.
Passwords and credentials stay with your team, never on labels or in cartons.
FURNITURE
Modular Workstation Dismantling and Reassembly
Modular office furniture comes apart in different ways depending on the system. At the survey, show us each type and tell us the make. We dismantle and reassemble standard systems where the design allows. Where a proprietary system needs the supplier's fitter, we will tell you before the quote is final.
Hardware pouching and seat tagging
Screws, brackets and levelling feet are bagged in labelled pouches with the seat or zone number, to help track fittings between sites.
Raceways and cable ducts
Internal raceways and cable troughs are removed carefully and kept with their workstation, ready for your cabling team at the new site.
Re-levelling
Benching systems are levelled on the new floor so partitions and tabletops fit flush.
Asset Record and Confidential Box Labelling
A simple asset record lets both teams check that everything left and arrived. This is an example of the fields to include. Your own list may need more.
Field
Example of what to record
Asset or box number
A unique number written on the item or box label
Type
Workstation, chair, monitor, server, file box
Serial number
For IT equipment
Current location
Floor, zone and seat
New location
Floor, zone and seat at the new office
Hardware pouch
Pouch number for dismantled furniture
Condition at loading
Existing marks noted
Checked at delivery
Initials of your representative
Confidential boxes: label them with a box number and destination only. Keep the index of what each box contains with your authorised staff, not on the carton or in the moving crew's copy.
Office Shifting Charges and Corporate Pricing Matrix
These are provisional planning guides for budgeting before a survey. They are not a fixed tariff. Your quote depends on the asset count and type, IT density, heavy items, access at both buildings, distance and timing. The table’s working windows are planning guides. Confirm the schedule and any accepted booking commitments against building rules, site readiness and your IT team’s tasks.
Office Capacity / Workstations
Local Shifting (Within City)
Intercity Move (Up to 800 km)
Interstate / Long Distance (800+ km)
Typical Move Window
Micro Office (5 – 15 Workstations)
₹15,000 – ₹35,000
₹35,000 – ₹70,000
₹50,000 – ₹95,000
Overnight / 1 Day
Small Office (15 – 40 Workstations)
₹30,000 – ₹60,000
₹65,000 – ₹1,30,000
₹95,000 – ₹1,80,000
1 – 2 Days (Weekend)
Mid-Enterprise (40 – 100 Workstations)
₹55,000 – ₹1,30,000
₹1,30,000 – ₹2,60,000
₹1,90,000 – ₹3,80,000
2 – 3 Days (Phased)
Large Enterprise HQ (100+ Workstations / Multi-Floor)
Custom Corporate RFP Quote
Custom Corporate RFP Quote
Custom Corporate RFP Quote
Turnkey Phased Transition
What a quote usually includes: packing materials, packing and handling crew, dismantling and reassembly of standard furniture, loading and unloading, and transport. The quote lists separately any crating, specialist lifting, holding or storage, after-hours work and transit cover. Applicable GST is shown on the quote and invoice.
The move windows describe indicative physical handling plans. They do not promise that an intercity journey or an IT restart will finish in the same period. Agree transport and restart dates separately.
FINANCE AND DOCUMENTS
Invoices and Documents for Your Finance Team
GST Invoice
A GST invoice showing GSTIN 36FDRPM0957B1ZC is issued for the move. The rate depends on how the services are classified and invoiced. Your finance team should confirm input tax credit eligibility with your accountant.
Consignment Note and Asset List
A consignment note and the itemised asset list signed at loading and delivery are provided for your records.
Business Goods Documents
Assess office assets, stock and new goods separately rather than applying the used-personal-household-effects exemption automatically. Tell us what is moving, and have your accountant check which movement documents or exemptions apply before dispatch.
Address Change Filings
If your registered office or other registered business premises are changing, your company secretary or accountant should advise which filings are needed and by when. A move between floors or to a branch may not need the same steps.
Tech Park and Commercial Building Requirements
Commercial buildings and tech parks set their own rules for goods movement. Ask the building management at both sites what they require. That often includes move permissions, security deposits, work permits for after-hours crews, safety gear and approved loading bay slots. Share their requirements with us so the crew and schedule match them.
Protecting the building
Lift padding: protective blankets in service lifts.
Floor runners: sheets laid along corridors to protect flooring.
Doorway guards: corner protection on entrance and corridor doors.
Loading bay slots: scheduled to fit the building's dock timings.
Tell us at the survey which of these your buildings require, so they are included in the quote.
Office Relocation Readiness Checklist
Use the dates as an example planning framework and adapt them to the size and agreed dates of your move.
90 to 60 days before
Finalise the new office layout and seating plan.
Form a small move team from admin, IT, HR and finance.
Book a survey of the current office.
Check notice dates for internet, phone and other services.
30 days before
Confirm the move date or phases and the written scope.
Apply for move permissions at both buildings.
Brief staff on packing personal items.
Order internet and phone lines at the new site.
7 days before
Distribute labels and personal cartons.
Complete and verify backups.
Confirm lift and loading bay bookings and gate passes.
Brief security and building management at both sites.
Move day and after
IT shutdown and labelling completed by your team.
Check assets and confidential box counts against the list at unloading.
IT reconnection and testing by your team.
Ask your company secretary or accountant which address updates and filings apply.
Corporate Relocation Services Across Major Business Hubs
Choose your city for local details. Availability, building requirements and dates are confirmed for your pickup and delivery addresses when you enquire.
How do you keep business disruption short during an office move?
By planning the physical move and the IT restart together. Many offices move after working hours or over a weekend, where both buildings allow it. Larger offices often move in phases. Your IT team handles backups, shutdown, reconnection and testing, while we handle packing, transport and placement. How quickly staff can work again depends on your IT team's plan and how ready the new site is.
How are IT equipment and servers handled during the move?
We pack, transport and place IT equipment, cushioned and labelled to its destination. Your IT team or provider takes and verifies backups, shuts systems down, de-racks servers and maps cables before packing, and reconnects and tests afterwards. UPS units and batteries are prepared as their maker or service vendor directs.
What does an office relocation cost?
As provisional guides for local moves: about ₹15,000–₹35,000 for 5–15 workstations, ₹30,000–₹60,000 for 15–40, and ₹55,000–₹1,30,000 for 40–100. For moves up to 800 km, the guides run from ₹35,000 to ₹2,60,000, and higher for longer distances. Larger offices are quoted after a survey. Your quote depends on the asset count and type, IT density, heavy items, access and timing.
Do you provide GST invoices for business billing?
Yes, a GST invoice showing GSTIN 36FDRPM0957B1ZC is issued for the move. The rate depends on how the services are classified and invoiced, and your finance team should confirm input tax credit eligibility with your accountant. A consignment note and the signed asset list are also provided.
How are confidential files and records handled?
Files are packed in sealed, numbered cartons or crates labelled only with a box number and destination. The index of contents stays with your authorised staff. Count boxes at loading and unloading, and agree which authorised people may open them.
Do you dismantle and reassemble modular office furniture?
Yes, for standard modular systems where the design allows, with hardware bagged and labelled by seat. Tell us the make at the survey. Some proprietary systems need the supplier's own fitter, and we will tell you before the quote is final if that applies.
Do you handle building permissions and lift bookings?
Your facility team applies for permissions at both buildings, and we work to the slots and rules they confirm. Tell us each building's requirements, such as permits, safety gear, lift padding and loading bay times, so they are included in the quote and schedule.
Is transit cover available for office equipment and furniture?
Transit cover is optional and arranged with a cover provider. Before choosing it, ask for the provider's name, what is covered and excluded, how declared values are set, the premium, and the claim process. Record the condition of equipment at loading and delivery.
Can you move employees' households for a company relocation?
Yes. Record each employee’s inventory, addresses and dates, then agree whether quotes and approvals are individual or handled through your company’s authorised booking process. Invoices follow the confirmed billing arrangement. Tell us how many moves are planned and the dates, and we will confirm availability for each.
Which filings are needed after an office move?
It depends on what is changing. If your registered office or other registered business premises are moving, your company secretary or accountant should advise which filings are needed and by when. Also update your bank, service providers and other contacts with the new address.
What if the new office is not ready on the move date?
Check power, internet, fit-out and building permissions before authorising loading. If something is not ready, decide in advance whether to delay, move only the areas that can be set up, or hold some items. If holding is needed, agree in writing who holds them, where, at what cost, and how they are released.